psn banner
Navigation
 Home
 Client Login
 Contact
 Legal
 Library
 Privacy Policy
 Services
 Tools


© 1999-2004 Penguin-Security Network's


Risk Assessment

An asset is said to be at risk when a threat agent (hacker, disgruntled employee, system user, natural event, structural failure, etc.) has the ability to exploit an asset's vulnerability. It is widely recognized that attempting to completely remove a threat agent or vulnerability is impossible for many risk scenarios. Therefore, some form of risk assessment must be undertaken to characterize the risk environment.

Risk assessments vary based on the system's life cycle:

  • Early stage system development requires analytical threat and vulnerability risk assessment.
  • Implementation and integration of sub-systems require security testing and risk scenario hypotheses.
  • Initial and on-going operational stage requires actual threat-vulnerability pairings.

Penguin-Security Networks can provide risk assessment to your company at all stages of system development and implementation.

Other Services:
[ Network architecture review and engineering ] [ Network Vulnerability Assessment (NVA) ]
[ Penetration teststing ] [ Security Policy Review and Procedure Development ]